TECHNICAL CENTRE APPLICATION GUIDE

The right system will not work
unless it is applied correctly.

Most coating failures stem not from the product but from the application. This guide brings together the six topics most frequently asked about on site: surface preparation, ambient conditions, mixing, application, film thickness and curing.

This page summarises general application rules. Mixing ratio, waiting times and film thicknesses vary by product; the product's own technical data sheet (TDS) is authoritative. Write to our technical team to request data sheets.

SIX STEPS

This is the sequence on site.

01

Surface preparation

The most decisive step for coating life. Oil and dirt are first removed with solvent/detergent; then abrasive blasting is carried out. No paint is applied until the cleanliness grade required by the system (usually Sa 2½) is achieved.

StandardISO 8501-1
Typical gradeSa 2½ — very thorough blast cleaning
RoughnessProfile specified in the product data sheet
CriticalSalt and dust residues must be removed
02

Ambient conditions

Air and surface are measured at the time of application. If the dew point rule is breached, an invisible moisture film forms on the surface and loss of adhesion is inevitable.

Surface temperatureAt least 3 °C above the dew point
Ambient temperatureGenerally +5 °C and above
Relative humidityGenerally below 85%
CriticalMeasurements are repeated every shift
03

Mixing and induction

In 2K products, the base and hardener are mixed in the ratio stated in the data sheet. Mixing by eye leads to incomplete curing and a soft film.

Mixing ratioOnly from the product data sheet
InductionObserved if specified in the data sheet
Pot lifeShortens as temperature rises
CriticalMaterial past its pot life must not be used
04

Application method

Airless spraying is the standard method for large surfaces. Brush and roller are used for touch-ups and inaccessible areas; the same thickness cannot be achieved in a single pass.

AirlessLarge surfaces, high output
Brush / rollerTouch-ups, weld seams, edges
Stripe coatA preliminary coat on edges and welds is recommended
CriticalTip and pressure are selected according to the data sheet
05

Film thickness

The system works through thickness. Wet film is measured during application, dry film after curing. Insufficient thickness shortens the protection period; excessive thickness causes cracking and sagging.

MeasurementWet film comb + DFT gauge
TargetTotal system DFT (µm)
RecordMeasurements are entered in the site report
CriticalToo much is as much a fault as too little
06

Curing and overcoating intervals

Each coat has its own drying time and overcoating interval. Overcoating too early leads to solvent entrapment; overcoating too late leads to adhesion problems.

Minimum intervalGiven in the data sheet by temperature
Maximum intervalIf exceeded, the surface is sanded
Full cureAllowed before putting into service
CriticalTimes vary with temperature
FROM THE FIELD

Common defects and their causes.

The first places to look when you encounter a coating failure. If in doubt, request a site inspection report; our team will inspect on site and identify the cause.

Loss of adhesion / peeling

Inadequate surface preparation, oil or salt residues, or the dew point rule has been breached.

Sagging (runs)

Too much material in a single pass, wrong tip selection or excessive thinning.

Orange peel

Wrong pressure/tip, unsuitable viscosity or incorrect spray distance.

Wrinkling

Topcoat applied before the undercoat had fully dried; solvent trapped underneath.

Pinholes

Application to a hot surface or escape of trapped air.

Colour / gloss variation

Different batches not blended, or uneven film thickness.

TECHNICAL DATA SHEET (TDS)

The product's own data sheet is authoritative

The mixing ratio, waiting times and target film thickness of the product you use are stated in its technical data sheet. We can send the data sheets you need on the same day.

Request a data sheet →